Saturday, 4 June 2011


























The edge insulation is fitted around the timber plates which will form the internal walls.  It will stop the timber drawing the moisture out of the lime screed too quickly when it is laid, and also provide an expansion gap around the edge of the screed once it is dry.  It is also fitted around the external walls, (along with additional insulation), against the blockwork, to try and reduce heat loss.












































The edge insulation supplied with the underfloor heating.

Monday, 30 May 2011

Sunday, 29 May 2011

Day 414


























We finished the threshold under the utility room door today - its amazing how long all these little jobs take!  We tried out using recycled plastic timber, as this will not rot, is recycled and will prevent a cold bridge.  It claims you can treat it exactly like timber - saw it, drill it, fix it etc.  We managed most things, however we did not have any success trying to nail it with the nail gun!  It is also heavier than timber.

Sunday, 22 May 2011

Day 407 - Internal walls set out on GF


























Sole plates for the internal walls downstairs set out and fixed down, in preparation for the underfloor heating to be laid.

The utility room/ plant room is behind the plywood wall, there is a small WC and then a study / sitting room on the right of the photo.  The entrance lobby can be seen in the back left of the photo and the hall / stairs will be on the left.  The photo is taken from the main living space which will be used as the kitchen, dining and sitting area.

Thursday, 19 May 2011

Wednesday, 11 May 2011

Day 396 - Cladding complete!













































Cladding complete!!

Tuesday, 10 May 2011

Day 395













































Cladding almost complete!

Monday, 9 May 2011


























Street view...