Door frames


A couple more door frames put in upstairs to Bedroom 4 and the family bathroom.

Tuesday, 10 April 2012

The first door lining fitted


The first door lining fitted to the downstairs WC.  This is one of the rooms we are going to use as a test for the plaster so we are progressing this first, along with bedroom 4.

Saturday, 31 March 2012

Starting to frame out the downstairs WC


We are working on framing the vanity counter in the downstairs loo - granted it doesn't look like much now but when it has the timber boarding on it, it should look good!

Sunday, 26 February 2012

Followed by the ceiling board



Followed by the ceiling board.


The first room to be done is the downstairs WC (it was the smallest room to try it out!).  It went well!  We now start putting up the resilient bars on the rest of the GF ceiling.


We also put up the concealed cistern while we were working in the WC and the plywood above, which we will fix the mirror to.

Sunday, 19 February 2012

Insulating the internal walls



We want to insulate the internal studwork walls to stop sound from travelling between the rooms and we had bought some Isonat insulation to try out.  It is made of a mix of wood fibre and hemp and is very dense about 50kg/m3.  It comes in batts which are 1200 x 370mm so it is easy to install within studwork at 400centres.


We installed the small quantity we had ordered and then tried to order enough to finish, but were advised that the product is made in France and that they were pulling out of the UK market.  We have two alternative products that we are looking at.


One is a this new product from Black Mountain Insulation, called Black Mountain Flex.  It is also a mix of hemp and wood fibre and I believe has a density of about 40kg/m3.

The other is warmcel, recycled newspaper which is blown in once the plaster board or what ever plaster substrate is being used, is fitted to one side of the wall.  Open blown has a density of about 30-35kg/m3.  The advantage of blowing the warmcel is that where we have cables and pipes concealed within the wall the warmcel will surround them.  If we were to use an insulation batt like the hemp and wood fibre then we would need to cut the insulation around the cables which would be tricky in places.

Sunday, 13 November 2011

Timber overboarding to kitchen wall


The clay plaster is now dry and so we started building the timber stud wall which sits infront of the clay.  We are only overboarding a few of the straw walls - this one will have all the kitchen units and cupboards fixed to it (it would have been difficult to fix into the straw).

Sunday, 23 October 2011

Studwork to the entrance lobby



We made a start on the studwork to the entrance lobby, there will be a built in cupboard against this wall for coats and shoes!

Sunday, 25 September 2011

Landing studwork


We completed the landing studwork and framing out the recessed bookshelf this weekend and also finished off some other odd bits.

Sunday, 18 September 2011


The majority of the basic studwork is now completed.  On the main landing wall we have the ductwork for the MVHR ventilation system running.  The idea for this wall is to build it out (to make it a thick wall) and in the centre there is going to be a recessed bookshelf.  This weekend we started framing out the bookshelf and building the studwork on the other side of the ductwork.

Sunday, 11 September 2011

More studwork


This weekends task was the partition between two of the bedrooms.  We are hoping to complete the studwork soon so we can post some more interesting photos on the blog!

Sunday, 4 September 2011

Back to the studwork


After a brief break from studwork last weekend we were back on it this weekend - framing out the ensuite, including the shower (pictured above).

Sunday, 28 August 2011

Plywood flooring


This weekend we focused on laying the plywood flooring upstairs and putting in the floor noggins (we did not complete these all - there were a lot to do!).  The 'smart ply' will form the base of our first floor build up.


Wednesday, 6 October 2010













































Ply sheathing fitted on small timber framed section of wall between master bedroom windows.

Thursday, 30 September 2010


























... the completed window linings on the first floor.












































First floor window linings complete in the bedrooms...

Saturday, 25 September 2010

Day 165













































The first bales put in on the first floor under the windows, ready for the window linings to be begun.

Friday, 24 September 2010


























Blocks fitted to each rafter for fixing the gutter to.












































Head section to both sets of sliding doors completed.

























Restraint straps fitted on the west gable.

Thursday, 9 September 2010

Day 150