Showing posts with label timber frame. Show all posts
Showing posts with label timber frame. Show all posts
Thursday, 12 April 2012
Tuesday, 10 April 2012
Saturday, 31 March 2012
Sunday, 26 February 2012
Followed by the ceiling board
Followed by the ceiling board.
The first room to be done is the downstairs WC (it was the smallest room to try it out!). It went well! We now start putting up the resilient bars on the rest of the GF ceiling.
We also put up the concealed cistern while we were working in the WC and the plywood above, which we will fix the mirror to.
Sunday, 19 February 2012
Insulating the internal walls
We want to insulate the internal studwork walls to stop sound from travelling between the rooms and we had bought some Isonat insulation to try out. It is made of a mix of wood fibre and hemp and is very dense about 50kg/m3. It comes in batts which are 1200 x 370mm so it is easy to install within studwork at 400centres.
We installed the small quantity we had ordered and then tried to order enough to finish, but were advised that the product is made in France and that they were pulling out of the UK market. We have two alternative products that we are looking at.
One is a this new product from Black Mountain Insulation, called Black Mountain Flex. It is also a mix of hemp and wood fibre and I believe has a density of about 40kg/m3.
The other is warmcel, recycled newspaper which is blown in once the plaster board or what ever plaster substrate is being used, is fitted to one side of the wall. Open blown has a density of about 30-35kg/m3. The advantage of blowing the warmcel is that where we have cables and pipes concealed within the wall the warmcel will surround them. If we were to use an insulation batt like the hemp and wood fibre then we would need to cut the insulation around the cables which would be tricky in places.
Sunday, 13 November 2011
Timber overboarding to kitchen wall
The clay plaster is now dry and so we started building the timber stud wall which sits infront of the clay. We are only overboarding a few of the straw walls - this one will have all the kitchen units and cupboards fixed to it (it would have been difficult to fix into the straw).
Sunday, 23 October 2011
Sunday, 25 September 2011
Sunday, 18 September 2011
The majority of the basic studwork is now completed. On the main landing wall we have the ductwork for the MVHR ventilation system running. The idea for this wall is to build it out (to make it a thick wall) and in the centre there is going to be a recessed bookshelf. This weekend we started framing out the bookshelf and building the studwork on the other side of the ductwork.
Sunday, 11 September 2011
Sunday, 4 September 2011
Sunday, 28 August 2011
Thursday, 30 September 2010
Saturday, 25 September 2010
Friday, 24 September 2010
Thursday, 9 September 2010
Subscribe to:
Posts (Atom)