Sunday 14 April 2013

Beginning to lay bathroom floor tiles


Rolling out the underfloor heating mat to go under the floor tiling.


Chasing in the sensor to fit under the tiles.


Setting out the line of the first row of tiles.


Laying the first row of tiles in the ensuite.  Tiles are bedded in a lime mortar.


Levelling the tiles.


First row of tiles in the ensuite complete.

Friday 12 April 2013

Ensuite and WC mirror arrive


Mirrors unloaded and waiting to be fixed - unfortunately currently no fixing holes.


Holes drilled for the lights to be fixed onto the mirror in the ensuite.

Sunday 7 April 2013

Setting out floor tiles in bathrooms


Uncovering the dusty tiles that we bought about 2 years ago!


Luckily we still like them.


Cutting the tiles.


Setting the tiles out dry.


Setting the tiles out in the family bathroom.

Saturday 6 April 2013

Getting ready to tile


Getting ready to tile. Waterproof primer applied to magnesium tile backer boards ready for wall tiling.