Monday, 14 March 2011
Saturday, 12 March 2011
Day 332 - Climbing plants planted
The front elevation (north-east) and north-west elevation are intentionally quite blank. This is to prevent excessive heat loss through openings / glazing facing north, which receive little sun / heat gains. The majority of windows are designed to face south instead.
To add interest to the front and north elevations we are planning to grow climbing plants up them, so in time they become 'green walls'. As the cladding is now complete on the front elevation we decided to give the climbing plants a head start (as they will take time to establish), and plant the 'Parthenocissus Henryana' (virginia creeper).
Thursday, 10 March 2011
Wednesday, 9 March 2011
Tuesday, 8 March 2011
Monday, 7 March 2011
Sunday, 27 February 2011
Thursday, 17 February 2011
Wednesday, 16 February 2011
Tuesday, 15 February 2011
Sunday, 13 February 2011
Day 304
More external rendering today. We finished the south elevation yesterday, and today we got from the road to the stair window on the north elevation.
We think the clay on the east (road) elevation has held up well under the poor winter weather conditions and does not need to be replaced. We will do some final inspections next weekend, but our fingers are crossed!
We think the clay on the east (road) elevation has held up well under the poor winter weather conditions and does not need to be replaced. We will do some final inspections next weekend, but our fingers are crossed!
Saturday, 12 February 2011
Another example of where the frost has blown off part of the previous coat of render. Whilst some of the render is still on the wall, it has lost its key to the render below. It was sole destroying but we had to knock a lot of it off, particularly at high level. If we hadn't knocked it off, it would have been pulled off by the application of the next coat of render.
Friday, 11 February 2011
Thursday, 10 February 2011
Day 301 - first part of the internal scratch coat
We completed the internal scratch coat on the internal side of the straw bales in what will be the utility / plant room. We will put studwork in front of this wall to fix all the plant back to shortly, so we want this to dry out quickly.
We have changed the mix of the clay render / plaster. On the dry external plaster, when the clay was aggravated it 'dusted off' the wall. This is undesirable, particularly on the internal walls, where we don't want a lot of plaster to end up on the floor everytime you touch the walls. To try and avoid this we ave increased the quantity of clay in the mix. The disadvantage of this is that will shrink more and may crack.
Wednesday, 9 February 2011
Day 300 - external rending resumed
We were back on the external rendering today. We started on the south elevation, which was the last area we rendered before the freezing weather. Since last year, some of the render had fallen off and a lot of it had lost its key from its backing and become very flaky and crumbly. We had to strip back a lot of the old render before applying the new coat, which will hopefully escape the sub-zero temperatures this time!
We completed half of the south elevation today.