DESIGNED: TO BREATHE
Blog
About Us
Natural Building & Breathability
Journey
Facebook
Interesting Reads
Saturday, 24 July 2010
Upper and lower levels complete on both sides. Now these need to be backfilled with top soil inbetween, and steps constructed in the centre. The tops also need to be trimmed to the right height.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment