The slab will be cast in two halves - today and tomorrow. The first half will be cast up to this dovetailed stop, which will be placed half way. This will create a key for the limecrete cast tomorrow. The timber shutter was wet down before being put in place. No movement joint is required between the two halves, only around the perimeter.
No comments:
Post a Comment