Sunday, 30 May 2010













































The levelling beam was placed over the footprint to give us a constant level.  The limecrete will be 150mm thick, so we wanted the top of the LECA to be between 130-140mm down from the levelling beam at this stage, before the final compaction (which would reduce the level).

No comments: