Saturday, 29 May 2010













































First job of the day was fixing the expansion board (made of wood fibre) to the inside of the blockwork.  It was fixed so the top was level with the top of the inner leaf of blocks, which will be the level to the top of the limcrete slab.  The boards were 150mm deep, the same as the depth of the limecrete.

No comments: