DESIGNED: TO BREATHE
Blog
About Us
Natural Building & Breathability
Journey
Facebook
Interesting Reads
Saturday, 7 February 2015
Getting finished
Getting fininshed
Getting finished
Monday, 1 December 2014
Soakaway and drainage finished
The soakaway creates
Thursday, 8 May 2014
Floor boards fitted on landing
Floor boards and landing balustrade posts fitted.
Overview of the landing.
Sunday, 4 May 2014
Landing balustrade posts all fitted
All lined up!
Starting to fit the stair balustrade posts
The top of the landing balustrade post.
A couple of posts fitted.
Posts are bolted to the stair trimmers using threaded rods.
Saturday, 3 May 2014
Floor boards finished in master bed and dressing area
Master bed floor.
Showing boarded wall and window seat in master bedroom.
Dressing room.
Older Posts
Home
Subscribe to:
Posts (Atom)