Saturday 7 February 2015

Getting finished




Getting fininshed








Getting finished


Monday 1 December 2014

Soakaway and drainage finished




The soakaway creates

Thursday 8 May 2014

Floor boards fitted on landing




Floor boards and landing balustrade posts fitted.



Overview of the landing.

Sunday 4 May 2014

Landing balustrade posts all fitted



All lined up!

Starting to fit the stair balustrade posts



The top of the landing balustrade post.



A couple of posts fitted.



Posts are bolted to the stair trimmers using threaded rods.

Saturday 3 May 2014

Floor boards finished in master bed and dressing area





Master bed floor.



Showing boarded wall and window seat in master bedroom.


Dressing room.