Todays task is to try and put in the chestnut retaining wall along the excavated bank at the back of the house. The diggers made us a small trench last week as it would have been a nightmare to try and bang the stakes into the chalk.
As there is quite a large step at the back we are going to create a stepped bank, with a planting bed at mid height between the proposed lawn (at the low level) and raised garden above.
First job to mark out the centre of the house, as there will be steps up to the high level in line with this.
Friday, 23 July 2010
Thursday, 22 July 2010
The frames are made up of ex. 50x100 (2x4) C24 timber. We have decided to leave the timber untreated. As the timber will be well ventilated and sheltered the risk of decay and insect attack seems to be low (it is more prevalent the when the moisture content in the timber increases above 20%).
By definition timber treatments are generally effective by being inhospitable to life, and the treated timber seems to come with long lists of health warnings! We also felt that the use of harmful chemicals was not appropriate for our healthy eco-build.
Wednesday, 21 July 2010
Monday, 19 July 2010
Friday, 16 July 2010
Wednesday, 14 July 2010
Saturday, 3 July 2010
Day 83
There was also the task of putting a 17metre insulation coil on the plastic water pipe. This pipe is to feed the external tap which will be in the centre of our vegetable garden. It needs to be insulated because it has to travel over the ground source heat pump pipe, and in some places is shallower than 750mm below ground level. This was really difficult and the insulation got very hot in the sun (as it was black) - I think I preferred filling the cavity with LECA!
Friday, 2 July 2010
The timber was delivered on a curtain sided lorry, as there were no hiabs available. The plan was to offload it all by hand. However, on seeing the amount of timber that arrived it was evident that this was going to take several hours! Our neighbour kindly rang the local stud to ask if we could borrow their telehandler to help, and they very generously obliged! Thank you everyone, it made the job much easier! Logistically it was quite difficult to lower the packs of timber onto the slab due to the plinth brickwork and straps, we did manage a couple however.