Sunday 28 August 2011

Plywood flooring


This weekend we focused on laying the plywood flooring upstairs and putting in the floor noggins (we did not complete these all - there were a lot to do!).  The 'smart ply' will form the base of our first floor build up.


Sunday 14 August 2011

Ductwork for the MVHR

The main supply and extract ductwork for the mechanical ventilation heat recovery system runs within the landing wall (the wall will be extra thick).    The supply pipe runs along the top and the extract underneath.

The ventilation system is required to provide the background ventilation because we are hoping to make the building very airtight and therefore would not get enough from drafts etc.  We also do not have any heating upstairs and are using the MVHR system to redistribute the heat around the house.

The MVHR system will supply air to the 'dry' rooms (bedrooms, sitting room, lobby etc) and extract air from the 'wet' rooms (bathrooms, utility room etc).  By undercutting the internal doors air will move from  the dry rooms (where it is being supplied) to the wet rooms (where it is extracted).

A short section of flexible ducting will be used to connect the main rigid ducts to the supply and extract grilles in the rooms.

Sunday 7 August 2011

More studwork

We finished off the studwork to the landing wall and doorway into the second bedroom.

Wednesday 3 August 2011

Visit



Cambridge Carbon Footprint are arranging a visit to look round our house on 1st October, details can be found on their website.  Click here for more information.