Cutting in short sections of resilient bar between the main runs. All edges of the magnesium board we are putting on the GF ceiling need to be supported so these noggins are located at the ends of the magnesium sheets.
Cutting a hole in the ceiling boards in the GF WC for the ventilation duct / grille.
No comments:
Post a Comment