Monday, 5 March 2012



The underfloor heating manifold with all the electrical switches and thermostats.

We are getting ready to commission the heat pump and solar hot water.  This needs to be done before the end of March to qualify for the grant.  It is a little sooner that we would have commissioned it otherwise.

No comments: