Sunday 22 May 2011


























Sole plates for the internal walls downstairs set out and fixed down, in preparation for the underfloor heating to be laid.

The utility room/ plant room is behind the plywood wall, there is a small WC and then a study / sitting room on the right of the photo.  The entrance lobby can be seen in the back left of the photo and the hall / stairs will be on the left.  The photo is taken from the main living space which will be used as the kitchen, dining and sitting area.

No comments: