One length of threaded rod was secured just above the current level of the blockwork, another was secured 225mm above this. These levels correspond with mortar beds in the masonry and so can simply be bedded in during the next phase of brickwork.
The location of the straps was co-ordinated with the post locations, so they do not collide.
No comments:
Post a Comment