Saturday 22 May 2010


























The sand and barrows are back!


The sand to blind the bottom of the excavation was delivered, and tipped just next to the excavation.  With hind site, we realised we should have asked for the sand to be delivered on a grab lorry.  This would have been able to put the sand in the excavation for us.  Sadly this thought occurred too late and yet another scaffold path was put together to navigate the barrows over the masonry and into the hole!

No comments: