Tuesday 13 April 2010













































Day 2 reinforcements, in the form of a dumper!


Having decided yesterday that it was just not possible to stack the soil by the side of the trench we investigated possible places to put it.  It was agreed this would be put at the back of the site over the proposed location of the new footprint.  This leaves space at the front of the site, also on top of the proposed footprint, for the 34 cubic meters (about 60tonnes) of sand we need to blind the trenches and cover the pipe loop with!

No comments: